The cottage is going to be Diane's Studio where she will do her ceramics and other crafts.

Overall except for the bathroom the cottage was in pretty good shape.  The problems in the bathroom came from a shabby toilet and
floor installation.  A plain plywood floor, a poor toilet installation and no backer board under the tile led to a rotted out floor and some
mold going up the wallls.  In the end these problems were all addressed and fixed.

 
 

  

From these pictures the bathroom doesn't look bad but check out the pictures that follow these two.


        


     



We have the cottage finished and have had guests already but don't have finished pictures yet.  It does look pretty nice though.  The pictures will follow.